Thanks, but this is not the problem. I have the following code already there:
SetBarsRequired(10000,10000); and if I plot the Risk:Reward ratio variable "rrwdL", it plots correctly from the first bar to the last.
Thanks, but this is not the problem. I have the following code already there:
SetBarsRequired(10000,10000); and if I plot the Risk:Reward ratio variable "rrwdL", it plots correctly from the first bar to the last.