Something less drastic would accomplish a: highlight the
loaded layout in the layout pull down window when trying to
load a layout (similar to the Layers tab)

Joseph Biran
____________________________________________
-----Original Message-----
From: [email protected]
[mailto:[EMAIL PROTECTED] On Behalf Of progster01
Sent: Friday, April 25, 2008 1:53 PM
To: [email protected]
Subject: [amibroker] Name/Status of Current Layout

Hi all.

Suppose I walked up to a running instance of AB ...

Is there a way to determine, with certainty,

a)  the name of the last layout loaded (the one now being
displayed)

b)  whether or not any edits have taken place since the last
layout
was loaded

I am thinking the answer is "No" to both questions, but I
would like
to be corrected if I am mistaken.

If I am not mistaken, I think some sort of interface display
to make
this information available would be helpful (ala the
'Database
information' display at the lower right).
------------------------------------

Reply via email to