Dennis. Thanks for some thoughts. I will think about your solutions. This is still about going around the problem rather than solving it, but it is better than nothing. A set of points is a study of its own, unfortunately not available currently in AB. What to do with these points is up to the script. It is hard to believe that AB missed the ball in this area. As I am aware, passing arrays from one indicator to another without re-calculating is only available in AB (KUDOS to TJ for it). There are some other features, so superior to other software packages, but ..... missing collecting points before script execution .. is a great and rather unexpected disappointment.
AF
