I appreciate all the email on this subject.

Interestingly, when lightning rods were placed on barns all over this country, I cannot recall any barn in our region ever catching on fire because of a lightning strike. I am sure that it did happen in other regions, particularly, in the Midwest/ The installation was to run a very large conductor cable from the lightning rod to the ground. There were generally two rods on either end of the roof. I would theorize that a lightning strike should be directed to a ground rod placed a few feet from the tower rather than to travel under the base of the tower as some have suggested. I am going to ground the tower at the three legs with a copper strap and then to a ground rod about 3 feet from the tower.

Also, the Empire State Building and other skyscrapers get struck many times during a thunder storm and I wonder if anyone knows if the lightning travels through the superstructure or through cables/straps to the base of the building and through ground rods.

Thanks

Dave, W3ST
Publisher of the Collins Journal
Secretary to the Collins Radio Association
www.collinsra.com - the CRA Website
Now with PayPal
CRA Nets: 3805 Khz every Monday at 8 PM EST
and 14255 every Saturday at 12 Noon EST
----- Original Message ----- From: "Gary Schafer" <[EMAIL PROTECTED]> To: "'Stevan A. White'" <[EMAIL PROTECTED]>; "'Discussion of AM Radio'" <[email protected]>; <[EMAIL PROTECTED]>
Sent: Monday, June 12, 2006 10:10 PM
Subject: [Boatanchors] RE: [AMRadio] Tower Construction


Be careful when giving this advice.
A UFER ground is a good SUPLEMENTAL ground in a tower base but it should not
be the only ground. A large area like a floor of a building provides more
surface for the lightning to dissipate. A tower concrete foundation may not
be large enough by itself and there is the possibility of poor connections
inside so that the concrete crack from a lightning strike if it is the only ground connection. It is always recommended that ground rods be attached to
each tower leg in addition.

73
Gary  K4FMX




DO RUN THE GROUND THROUGH THE CONCRETE! Take a look at the information on
this site first though.  You may be glad you did.

http://www.scott-inc.com/html/ufer.htm

Best Regards,
Steve White, W5SAW
SW Commercial Electronics


-----Original Message-----
From: Ed Swynar [mailto:[EMAIL PROTECTED]
Sent: Saturday, June 10, 2006 2:16 PM
To: Discussion of AM Radio; [EMAIL PROTECTED]
Subject: Re: [AMRadio] Tower Construction


Hi Dave,

I have a 48' tall, tapered, self-supporting "Delhi"-brand tower --- 6
sections at 8' long each.

The prescribed / manufacturer's recommendation is to bolt a 3' straight
formed extention at the base of each leg (total of 3), & to "suspend"
these
(a temporary wooden "cradle" will do admirably, as the cement sets) in a
hole dug 4' square, & 4-1/2' deep --- the cement is to come but a few
inches
below the bottom legs of the actual tower section.

Oh yes --- the bottom 1' of the square hole is to be "belled" outward a
foot, or so.

The documentation says this is good for heights of up to 64', or so...I've
never gone beyond 48', & have never, EVER had an ounce of trouble in the
two
locations that I've had my tower up.

BTW, the top of the tower as an old Cornell-Dubelier AR-44 rotator, & a
3-element Hy-Gain TH3 MkIII triband yagi...

Use "industrial"-grade coarse cement, & do NOT run any ground leads
through
the block itself!

~73~ Eddy VE3CUI - VE3XZ


_______________________________________________
Boatanchors mailing list
[EMAIL PROTECTED]
http://mailman.qth.net/mailman/listinfo/boatanchors
** List Administrator - Duane Fischer, W8DBF/W9WZE **
** For Assistance: [EMAIL PROTECTED] **
$$ For vintage radio info, see the HCI web site $$
http://www.w9wze.org


Reply via email to