> Well, it would get written even if it contained the date, wouldn't it? Why
> not put ERRFILE commands at the top of each site.cfg?
>
> -> There are several runs for each site so the batch file, which runs
> overnight, might look like:
>
analog +gsite1.cfg +greport1.cfg
analog +gsite1.cfg +greport2.cfg
analog +gsite1.cfg +greport3.cfg
This would mean that the error log from the 3rd run would be the
only one at the end of the run.
There are also so far about 30 sites so that is 30 files to edit.
But by putting %h%n into the error report filename then it could go once
into analog.cfg.
+------------------------------------------------------------------------
| This is the analog-help mailing list. To unsubscribe from this
| mailing list, go to
| http://lists.isite.net/listgate/analog-help/unsubscribe.html
|
| List archives are available at
| http://www.mail-archive.com/[email protected]/
| http://lists.isite.net/listgate/analog-help/archives/
| http://www.tallylist.com/archives/index.cfm/mlist.7
+------------------------------------------------------------------------