I have a dynamic inventory that has dynamic groups ( I don't know them ahead of time ) and each group requires a special tunnel be setup and then torn down before/after each groups hosts plays are processed. I thought this would be simple but I have not found a good way. Does an AWX have any method for launching a workflow once the previous workflow has finished ?
-- You received this message because you are subscribed to the Google Groups "Ansible Project" group. To unsubscribe from this group and stop receiving emails from it, send an email to [email protected]. To view this discussion on the web visit https://groups.google.com/d/msgid/ansible-project/050ef74d-86bf-4e4a-9a4e-2e6b0f50fb77n%40googlegroups.com.
