Hi again

I Just tried the command on the AP-sample three way join form, and got the same 
result...

C:\Program Files\BMC Software\ARSystem\approval\bin>arjoinfix -portnum 2020

Action Request System(R) Approval Server   Version 7.5.00 Patch 002 200906100308
(c) Copyright 1999-2009 BMC Software, Inc.


Enter the name of the form: AP-Sample:Lunch-Detail-Signatu


----------Menu----------

1. Update Join Criteria

2. Add New Fields In 3-Way Join Form

Default: Quit


Make your choice & Press <enter>: 2

No join is defined between the form and the approval detail form (ARAPPERR 4611)
   AP-Sample:Lunch-Detail-Signatu

Press <enter> to exit the program
C:\Program Files\BMC Software\ARSystem\approval\bin>


Now the questions are:
- is this an error in arjoinfix?
- is this an error in the sample APP (and my app)?
- is this an error in the AP:Detail form?

with regards,

Jonas Stumph Stevnsvig
Remedy Developer
BEC Competence Centre
Phone  (+45) 46 38 20 08
Mobile  (+45) 61 56 20 08
[email protected]
[email protected]

________________________________
Fra: Action Request System discussion list(ARSList) 
[mailto:[email protected]] På vegne af Jonas Stumph Stevnsvig
Sendt: 10. september 2009 21:48
Til: [email protected]
Emne: Approval server ARAPPERR 4605 & 4611

**
Hi listers,

I sincerely hope that there are some insomniacs out there with some knowledge 
of the approval server's innard, because I am well and truly STUCK.

We have migrated an application from a 6.3 environment with approval server 6.X 
to a 7.5 server with approval server 7.5, and everything seems to be fine and 
dandy on the surface. Simple approvals pass without incident, but if we use 
certain flow rules, we get an ARAPPERR 4605, after executing a "Det-Cancelled" 
command

<from the error message guide>
"Sig-xxx command requires process to match details if process is specified.
The process specified in the issued command (sig-approved, sig-rejected, 
sig-cancelled, sig-reassign, sig-notify) does not match the process specified 
in the details record of this pending approval request."

which - as far as I can gather, means that there is a missing link somewhere 
between the AP:detail, AP:Signature and our request form.

I have gone over the approval server documentation several times, and verified 
that all required fields are present on the three way and two way join forms, 
and that all permissions and IDs are set correctly.

As an attempt to verify my work, i ran the arjoinfix.exe command and got 
another ARAPPERR, #4611:

No join is defined between the form and the approval detail form (ARAPPERR 4611)
   LAK:Bestilling-Detail-Signature

<from the error message guide>
No join is defined between the form and the approval detail form.
Before you use the Approval Server with your application, you must join your 
application form to the AP:Detail form.
Instructions are in the Approval Server Guide.

if any of you have a hint or two for me - please feel free to reply.

thanks in advance



regards,



Jonas Stumph Stevnsvig
Remedy Developer
BEC
Phone  (+45) 46 38 20 08
Mobile  (+45) 61 56 20 08
[email protected]
[email protected]

_Platinum Sponsor: [email protected] ARSlist: "Where the Answers Are"_

_______________________________________________________________________________
UNSUBSCRIBE or access ARSlist Archives at www.arslist.org
Platinum Sponsor:[email protected] ARSlist: "Where the Answers Are"

Reply via email to