Hey guys
I have been dealing with a persistent problem with a CRQ that has processed all 
approvals however the CRQ still is stuck in Scheduled For Review status.  We 
are using ITSM 7.5.

One of our setups is currently skipping Request for Approval phase.  For this 
setup, the Approval Process Configuration is configured so that when a CRQ in 
Scheduled For Review is approved, it moves to Scheduled instead.

Recently, we have noticed that this is not happening for select CRQs.  The 
approval logs have pulled up the following exerpt:

<APPR> (Fri Aug 16 2013 16:16:29.7359)                                 --> Run 
If passed -- perform set of next approver list for this rule
<APPR> (Fri Aug 16 2013 16:16:29.7360)                                 Starting 
processing of set fields operation
<APPR> (Fri Aug 16 2013 16:16:29.7369)                                 
Qualification:('Assignment Availability' = "Yes") AND (('Approval Risk Level' < 
$Risk Level$) OR ('Approval Risk Level' = $\NULL$)) AND ('Infrastructure Change 
ID' = $Infrastructure Change ID$) AND ('Approval Definition ID' = $Temp Char 1$)
<APPR> (Fri Aug 16 2013 16:16:29.8008)                                 Done 
processing of set fields operation -- no new approval level so no set
<APPR> (Fri Aug 16 2013 16:16:29.8009)                                 
Detailed:Proceeding to get next Approver in normal execution
<APPR> (Fri Aug 16 2013 16:16:29.8105)                                 Approved 
-- no next approver and configured to approve on no next
<APPR> (Fri Aug 16 2013 16:16:29.8106)                                 Set 
approval details record for this entry to state Approved
<APPR> (Fri Aug 16 2013 16:16:29.8388)                 Entry does not exist in 
database <0> (ARERR 302)
<APPR> (Fri Aug 16 2013 16:16:29.8389)                                 Update 
failed.Update on approval detail record failed for prepending state
<APPR> (Fri Aug 16 2013 16:16:29.8390)                                 Prepare 
notification for Approve
<APPR> (Fri Aug 16 2013 16:16:29.8392)                                 Getting 
alternates for approver(s): <list of people>
<APPR> (Fri Aug 16 2013 16:16:29.8415)                                 No 
alternates defined for this approver list
<APPR> (Fri Aug 16 2013 16:16:29.8716)                                 Sent to 
<list of people>
<APPR> (Fri Aug 16 2013 16:16:29.8718)                 Operation cancelled due 
to error (ARAPPNOTE 4502)

Our change control analysts get around this issue by manipulating the Change 
Assignee and getting the change pushed back to Planning In Progress, and having 
it set up for approvals again.  Usually on the second try, this works without 
issue.

We're trying to figure out what entry the approval engine is looking for that 
would prompt the "Entry does not exist" error.  As such, the CRQ always stays 
in Scheduled For Review as the approval process is interrupted by this error.

Any help would be appreciated.

Thanks

Eric Chow

---------------------------------------------------------------------
This transmission (including any attachments) may contain confidential 
information, privileged material (including material protected by the 
solicitor-client or other applicable privileges), or constitute non-public 
information. Any use of this information by anyone other than the intended 
recipient is prohibited. If you have received this transmission in error, 
please immediately reply to the sender and delete this information from your 
system. Use, dissemination, distribution, or reproduction of this transmission 
by unintended recipients is not authorized and may be unlawful.

_______________________________________________________________________________
UNSUBSCRIBE or access ARSlist Archives at www.arslist.org
"Where the Answers Are, and have been for 20 years"

Reply via email to