What is this money for? I guess its for the transmission lines to evacuate
> the power from NER. I learnt that Powergrid got Non Sovereign 5.4 Bn $ from
> ADB for constructing the line upto Agra.
>
> MKD
----------------------------
Even MKD has to GUESS India's PLanning Process- emanating from under
various shades of Blue Turbans.
He Guesses that:
POWERGRID got a Non- Sovereign $ 5.4Bn LOAN from ADB -- just on words of
mouth?? Strange!! A load on Assam's neck till eternity? Some body should
shout out Loud "Assam is not a party to any LOAN Taken in Assam's name"
To EVACUATE the power from NER . Be Cleverer -- use all power at
damsites . Even if Killer Xuvonxiri dam is Built High - it cannot ever
generate more than 1.4 million MW-Hrs a year. At average 14000Kw-Hr
needed to Convert Alumina to a Tonne Aluminium metal ,all you can produce=
1 Lakh Tons /year-- WITHOUT a Line costing $5.4BillionxN times. Even Vedanta
types - not to speak of NorskHydro/Alcan would have built a safe Dam Cascade
and used all the energy without a debt on Assamese' necks .
-------------------- Every Tom Dick Harry will now Jump at my
Throat--" Where from the 2 Lakh Tonnes Alumina"
Answer -- Ask Torun WHERE are ALUNITE/BAUXITE? He must be having all the
Drilling Core analysis from 5 million meter Oil/Gas Drill bores .
OR HAS he none ?
" I know TET. I know Bihu,What is this Core Analysis??"
If he says that or gives me Gaali as a disruptor Maoist -- you will know why
India has No more Hope !!
mm
_______________________________________________
assam mailing list
[email protected]
http://assamnet.org/mailman/listinfo/assam_assamnet.org