What is this money for? I guess its for the transmission lines to evacuate
> the power from NER. I learnt that Powergrid got Non Sovereign 5.4 Bn $ from
> ADB for constructing the line upto Agra.
> 
> MKD

----------------------------
  Even MKD     has to GUESS   India's PLanning Process- emanating   from under 
various shades of Blue Turbans.

  He Guesses   that:
  POWERGRID got a Non- Sovereign  $ 5.4Bn  LOAN from ADB  -- just on words of 
mouth??  Strange!!   A load on Assam's neck till eternity?   Some body should 
shout out Loud    "Assam is not a party to any LOAN   Taken   in Assam's name"
To EVACUATE     the power from NER  . Be Cleverer -- use all   power  at 
damsites .  Even if Killer  Xuvonxiri   dam is Built  High -  it cannot ever 
generate  more than  1.4 million MW-Hrs  a year.   At   average 14000Kw-Hr 
needed   to Convert Alumina to  a Tonne Aluminium metal  ,all you can produce= 
1 Lakh Tons /year-- WITHOUT a Line costing $5.4BillionxN times.  Even Vedanta 
types -   not to speak of NorskHydro/Alcan  would have built a safe Dam Cascade 
and   used all the energy without a   debt on Assamese' necks .
--------------------  Every   Tom Dick Harry     will   now  Jump at my 
Throat--" Where from the 2 Lakh Tonnes Alumina"
Answer -- Ask Torun WHERE   are ALUNITE/BAUXITE? He must be having all the 
Drilling Core analysis  from 5 million meter Oil/Gas Drill bores .
OR HAS   he none ?
" I know TET. I know Bihu,What is this Core Analysis??"  
If he says that or gives me Gaali as a disruptor Maoist  -- you will know   why 
India has No more  Hope !!