Title: Re: [riverlink] National Water Grid? Kalam says, 'Yes'- -C
At 10:58 PM +0530 10/20/04, Srinivasan Kalyanaraman wrote:
Please tell me where I wrote the answers you attribute to me. Give me
a break, Chandan. I DID NOT write the answers, to the best of my
recollection. Please cite the URLs or Message Numbers. Maybe, you are
confused. Dhanyavaadah.


The following is the transcript of your post to Shri Ram Krishnan dated September 2004:


Chandan




i="3.84,179,1091419200";
   d="scan'217,208"; a="292957305:sNHT20158972"
X-Yahoo-Newman-Property: groups-email
X-Sender: [EMAIL PROTECTED]
X-Apparently-To: [EMAIL PROTECTED]
To: espi <[EMAIL PROTECTED]>
X-eGroups-Remote-IP: 64.233.170.193
From: Srinivasan Kalyanaraman <[EMAIL PROTECTED]>
X-Yahoo-Profile: kalyan97
X-eGroups-Approved-By: riverswatch2003 <[EMAIL PROTECTED]> via web; 27 Sep 2004 07:28:51 -0000
X-eGroups-Remote-IP: 66.218.66.86
Mailing-List: list [EMAIL PROTECTED]; contact [EMAIL PROTECTED]
Delivered-To: mailing list [EMAIL PROTECTED]
List-Unsubscribe: <mailto:[EMAIL PROTECTED]>
Date: Sun, 26 Sep 2004 11:00:35 +0530
Subject: [riverlink] FAQ National Water Grid
Reply-To: [EMAIL PROTECTED]
Responses to comments of Shri Ram Krishnan.

�      I am looking at all of India and just the peninsular rivers in South
India.

Yes, indeed. The grid has to be viewed from an all-India perspective.
If we focus only on peninsular rivers, it will only become a sharing
of scarcity. We have to principally harness two great rivers: one
east-west flowing in Bharat, Brahmaputra; two months' flood-peaks of
this river alone are adequate to save Ganga and make all the
peninsular rivers perennial the other is S'arada (called
Mahakali/Karnali in Nepal) which alone has a hydro-electric potential
and will bring the Rebirth of River Sarasvati flowing upto R.
Sabarmati. So, it is crucial to look at all Bharat treating water as a
national asset to create a National Water Grid (not merely
interlinking).
>
> Physics of the linkages
>
> a. The suggested links between the rivers, can only take place at the
> tail end of the rivers. If such connections were made up stream, then
> the people along the river upstream will not allow that.

Not correct. The links will take place at places where reservoirs can
be built, which means the location of natural settings of hills which
will enable cost-effecting check-dams. Almost the entire set of 30
links will flow only by gravity excepting at Inchampalli (Godavari)
where a lift of about 300 ft. will be involved for a small portion of
the hydrological flows. Even this can be reduced by tunneling options.
In fact, the link should also take off from Alamatti on Krishna river,
so that districts of Kollegal, Palghat, Coimbatore, Pollachi and Erode
can create a sub-regional water grid.

> b. Most rivers in the heart of India, flow from west to east with one or
> two exceptions. If the rivers are connected at the tail end, usually in
> the east, how will the water run upstream (east to west).

A surprising finding of the experience with dams has been that
upstream regions get their groundwater tables recharged. We are
blessed with the Sahyadri ranges on the west where a contour canal
(similar to Konkan Railway) will provide for sharing of waters to the
areas west of Sahyadri and also augment the water resources of
Tungabhadra (Bedti-varda link), Kaveri (Hemavati-Netravati link) and
Vaippar (Pamba-Achankovil link). These links are crucial to maintain
the vegetation and forests on the uplands. Every tree is a reservoir
and will help recharge the groundwaters and help in water haresting of
precipitation runoffs.

> c. If many of these rivers have existing hydro electric dams and flow
> past the dams are regulated for agricultural needs, how much water will
> actually flow to the end of the river.

Our engineers are brilliant experts in this field of assessment of
water resources. A minimum, mandatory condition should be to maintain
a minimum level of flows in all river run-offs to maintain the
ecological balance of fishes, snails, shrimps and other water-based
living organisms which thrive in running water, swamps, marshes and
wetlands.

> d. I was told, for instance, where Cauvery river enters the Bay of
> Bengal in the Kolladam area, it divides itself into hundreds of small
> tributaries and almost no Cauvery water actually reaches the ocean.

This is the natural formation of delta for every river. Karikaala
Chola's kallanai was a brilliant use of these delta waters and forking
them to the northern areas of Kaveri bringing another 10 lakh acres of
rich alluvial land under cultivation with assured irrigation. That
this 2000 year-old engineering marvel serves Tamilnadu even today is a
tribute the engineering excellence of our elders. Similar grand
anicuts have been found in S. Africa leading historians to surmise
that Tamils introduced these structures in African continent.
>
> my other questions are about finances and funding
>
> e. During the last administration, this project was estimated to cost Rs
> 5,600 crores. Please correct me if I am wrong.

Wrong. The figure estimated is Rs. 5.6 lakh crores (i.e. about 120
billion US dollars equivalent).
> f.  How much of this money is for the actual project? ( materials, labor
> etc)

This is a ball-park estimate, detailed cost breakdowns will get worked
out during detailed engineering design phases. What National Water
Development Agency set up in 1982 and with 200 engineers have
completed are pre-feasibility studies for all 30 links.

> g.  How can we make the actual region of India - the people and the
> communities - take ownership of these projects.

This is a super question and contains a brilliant solution to make
this a Peoples' Project. There are two component: reservoirs and
links. Reservoirs are complex engineering structures which have to be
left to 30 link corporations with support from L&T, Engineers India
type of construction agencies to deliver. Link components can be
entrusted to panchayati raj institutions as executing agencies by
making them shareholders. Every beneficiary of the 9 crore acres of
additional wet land with assured irrigation (say 9 crore poor
families) should become partners in this project by providing them
with loans from financial institutions consortium (LIC, NABARD, SBI,
ICICI, IDBI, Rural Banks and other financial institutions) at a
reasonable interest rate with a grace period of 5 years and repayment
period of 15 years for the Brahmaputra/Sarasvati Bonds as were floated
for financing the Konkan Railway. That is, the project can be funded
WITHOUT government budgets (excepting for the capital at charge,
initial capital to kick-start the 30 link corporations). At a rate of
Rs.1 lakh per acre, the bonds will generate Rs. 9 lakh crores upfront
to meet all the costs of the project and also to repay the capital
funded by the Govt. of India. We need no funding from external
agencies. There is enough money within the financial system of the
country as proved time and again by the over-subscription to IPOs such
as TCS.

> h.  Large Civil engineering companies - L&T, and others - will have zero
> interest in seeing the communities benefit from this project. Their
> interest will be to complete the projects, collect the money and leave.

That is right, they are contractors and will execute specific contract
packages for reservoirs. The rest of the project can be done by the
people themselves as was done by the people of Uttaramerur, near
Kanchipuram during Chola days of the 10th century. (cf. Uttaramerur
inscription).

> Due to inadequate berming, the new Narmada canal has cracks and water is
> flooding outside before reaching the destination.

Normally, the link canals should be well-lined to prevent such
seepages. The velocity of flows also should be regulated especially in
links which will be used as 25,000 kms. of waterways.
>
> We need water everywhere in India. Water and Income Generation were the
> only 2 topics in our Vilathikulam project.  I want the River Linking
> project to succeed and bring water to the communities.

Way to go. The interlinking project should be renamed National Water
Grid. The grid should evolve with regional and sub-regional grids and
take up the projects on a war-footing as watershed management
projects, watershed being defined as a local water community
irrespective of the source of water: be it sea-water or saline river
water to be desalinated using semi-permeable membranes, be it glacier
waters to make all run-offs all over the country as perennial river
flows, be it waters in dug-cum-bore wells, tanks, swamps, marshes, be
it groundwater aquifer or subsurface drainage system, be it water used
forestoring forest cover from the present 11% land area to 30% land
area, be it water used for upland forestation, be it water used for
drinking or for irrigation. This blue-gold water grid should be looked
upon as the project with the potential to take the nation to a
developed status by 2020 and to empower all panchayati raj
institutions for grama swarajyam.

Dhanyavaadah.

Kalyanaraman
_______________________________________________
Assam mailing list
[EMAIL PROTECTED]
http://pikespeak.uccs.edu/mailman/listinfo/assam

Mailing list FAQ:
http://pikespeak.uccs.edu/assam/assam-faq.html
To unsubscribe or change options:
http://pikespeak.uccs.edu/mailman/options/assam

Reply via email to