ASSP development mailing list <[email protected]>
schreibt:
>1.7.1.3(0.0.15) is doing the same thing.  I've never noticed ASSP
>subtracting from the Bayesian score until these last few revisions. 
>Is
>it something new?  I always thought it was either 40 or nothing (40 is
>my setting).
>
>X-Assp-Score: 39 (Bayesian Probability: 0.9961)


Yes, it is new. All or nothing is an outdated concept. ASSP goes into
a fuzzy future ))).
And no it is not doing the same thing. The last post you send, showed
probality of 1 and score of 39. The reason was, it showed 1, but in
reality it was 0.99996.. I promised, to better show what we are doing
and I did so.

------------------------------------------------------------------------------
Download Intel&#174; Parallel Studio Eval
Try the new software tools for yourself. Speed compiling, find bugs
proactively, and fine-tune applications for parallel performance.
See why Intel Parallel Studio got high marks during beta.
http://p.sf.net/sfu/intel-sw-dev
_______________________________________________
Assp-test mailing list
[email protected]
https://lists.sourceforge.net/lists/listinfo/assp-test

Reply via email to