ASSP development mailing list <[email protected]> schreibt: >1.7.1.3(0.0.15) is doing the same thing. I've never noticed ASSP >subtracting from the Bayesian score until these last few revisions. >Is >it something new? I always thought it was either 40 or nothing (40 is >my setting). > >X-Assp-Score: 39 (Bayesian Probability: 0.9961)
Yes, it is new. All or nothing is an outdated concept. ASSP goes into a fuzzy future ))). And no it is not doing the same thing. The last post you send, showed probality of 1 and score of 39. The reason was, it showed 1, but in reality it was 0.99996.. I promised, to better show what we are doing and I did so. ------------------------------------------------------------------------------ Download Intel® Parallel Studio Eval Try the new software tools for yourself. Speed compiling, find bugs proactively, and fine-tune applications for parallel performance. See why Intel Parallel Studio got high marks during beta. http://p.sf.net/sfu/intel-sw-dev _______________________________________________ Assp-test mailing list [email protected] https://lists.sourceforge.net/lists/listinfo/assp-test
