Hi, I wonder if anybody can share their experience of this. I am designing a system with 90 GotoIfTime conditions to check through for a match.
Bascially each month day will be split in to 3 time ranges and a month has 31 days in, so this gives a possible 90+ combinations, nearer the end of the months the dialplan will have to traverse through nearly all of these. How much load/slowdown (if any) can I expect from this? Assuming a low end Celeron 3.0Ghz box with 512mb memory. I'm guessing myself it won't be a big deal but I just want to check before I commit too much. thanks Mike _______________________________________________ --Bandwidth and Colocation provided by Easynews.com -- asterisk-users mailing list To UNSUBSCRIBE or update options visit: http://lists.digium.com/mailman/listinfo/asterisk-users
