Hi all,

Does anyone layer any sort of testcase management tool (e.g. testopia, 
testlink, etc.) on top of autotest to manage testing at a higher level than 
individual jobs?

My team is specifically looking for some sort of layered solution that would 
allow multi-level test plans with at least 3 levels:

Project/Program/Requirement
-- test plan
---- test case
------- test step

Each of these would support multiple children (e.g. a testplan would be 
composed of 1 or more testcases).

The idea is that when you get to the test case or test step level you would 
generally be doing one of  2 things:

1)      launching an autotest job and having its results linked back into the 
testcase

2)      doing some other non-autotest test scenario (potentially manual 
testing) and having the tester report back the result directly into the 
testcase management tool

I know there are testcase management tools out there, but are there any that 
have been setup to integrate well with autotest?