Hi all, Does anyone layer any sort of testcase management tool (e.g. testopia, testlink, etc.) on top of autotest to manage testing at a higher level than individual jobs?
My team is specifically looking for some sort of layered solution that would allow multi-level test plans with at least 3 levels: Project/Program/Requirement -- test plan ---- test case ------- test step Each of these would support multiple children (e.g. a testplan would be composed of 1 or more testcases). The idea is that when you get to the test case or test step level you would generally be doing one of 2 things: 1) launching an autotest job and having its results linked back into the testcase 2) doing some other non-autotest test scenario (potentially manual testing) and having the tester report back the result directly into the testcase management tool I know there are testcase management tools out there, but are there any that have been setup to integrate well with autotest? Thanks, Dan
_______________________________________________ Autotest-kernel mailing list [email protected] https://www.redhat.com/mailman/listinfo/autotest-kernel
