Perhaps the Maven folks could be triggered for a 1.1 release also?

regards

Franz

Ajith Ranabahu schrieb:
Hi Steve,
I know the exact problem and we are planning to address it. We have
already planned the major components (such as axiom and policy) to be
released before the 1.0. These components are fairly stable and can be
released without a problem.
So it's going to be based on some standard versions rather than snapshots

Ajith

On 3/22/06, Steve Loughran <[EMAIL PROTECTED]> wrote:
  
Sanjiva Weerawarana wrote:

OK. The other thing is that you can't do a release that depend on
-SNAPSHOT versions of things.

Because doing so makes it impossible for anyone to ever recreate your
initial state once the stuff in the maven scratch repositories changes



    


--
Ajith Ranabahu


  

begin:vcard
fn:Dr. Franz Fehringer
n:Fehringer;Franz
org:ISO Software Systeme
adr;quoted-printable:;;Eichendorffstrasse 29;N=C3=BCrnberg;;90491;Deutschland
email;internet:mailto:[EMAIL PROTECTED]
tel;work:+49/(911) - 99594-0 
tel;fax:+49/(911) - 99594-580
x-mozilla-html:TRUE
url:http://www.isogmbh.de/
version:2.1
end:vcard

Reply via email to