Hi All,
I'm trying to fix some of the failing whitemesa interop tests in the integration/itest folder.
It seems that the validation of the results is done by a XML comparison
of a pre-saved result envelope (which are located in the
integration/itest-resources/interop/whitemesa folder), with a newly
obtained result. Is this way correct ? I mean the test cases would fail
in any change of the result XML. (For e.g. if the result env.
contain any additional headers/attributes or by a prefix change of any
namespace).
Chamikara
- [Axis2] Validation of itests Chamikara Jayalath
- Re: [Axis2] Validation of itests Eran Chinthaka
- Re: [Axis2] Validation of itests Chamikara Jayalath
