----- Original Message ----- From: "Davanum Srinivas" <[EMAIL PROTECTED]> To: <[EMAIL PROTECTED]> Sent: Monday, September 23, 2002 10:20 Subject: Re: managing change during the 1.0 release process
> Sanjiva, > > Yes, i agree that we should lock-down changes at this time or we will never get the product out. I > was simply saying that some of the problems occur because of unintentional changes, which can be > prevented by a strong test suite early in the cycle. > Maybe the problem is that Axis, as with any networked app, is a dog to test. The more tests we get, the better, but it is hard to set up some test constructs (high latency connections, transatlantic links, etc) and have everyone run them before committing changes. -steve