This was reported to me on IRC If you run a BASE level job, it is actually run as a FULL.
However, that FULL will not be recognized by a DIFF job. The DIFF job will use a previous FULL, not the one run as a BASE. Is this intended/accidental/expected? User was on 2.2.5 -- Dan Langille -- http://www.langille.org/ [EMAIL PROTECTED] ------------------------------------------------------------------------- This SF.net email is sponsored by: Microsoft Defy all challenges. Microsoft(R) Visual Studio 2008. http://clk.atdmt.com/MRT/go/vse0120000070mrt/direct/01/ _______________________________________________ Bacula-devel mailing list Bacula-devel@lists.sourceforge.net https://lists.sourceforge.net/lists/listinfo/bacula-devel