This was reported to me on IRC

If you run a BASE level job, it is actually run as a FULL.

However, that FULL will not be recognized by a DIFF job.  The DIFF
job will use a previous FULL, not the one run as a BASE.

Is this intended/accidental/expected?

User was on 2.2.5

-- 
Dan Langille -- http://www.langille.org/
[EMAIL PROTECTED]





-------------------------------------------------------------------------
This SF.net email is sponsored by: Microsoft
Defy all challenges. Microsoft(R) Visual Studio 2008.
http://clk.atdmt.com/MRT/go/vse0120000070mrt/direct/01/
_______________________________________________
Bacula-devel mailing list
Bacula-devel@lists.sourceforge.net
https://lists.sourceforge.net/lists/listinfo/bacula-devel

Reply via email to