It is kinda...
What's listed under the Volume column is the tape that the next scheduled
job will be written to, or is the tape that is currently loaded in the
drive, I do not know.
What I was really asking is how does it select which tape to grab next
when the current tape gets full. The answer to that question is (as the
tape got full and it switched tapes) it will use the next tape in the
volumes table or list.
I had tape 10 loaded and the next 3 tapes in the table were status
"Purged" so the 4 one was tape 5 which it loaded and is currently
writing to.

So unless I am wrong, and something else happened, it goes to the next
one in the list so to speak...

-
Thank you,
Grant Della Vecchia
System Administrator
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
A I S M e d i a , I n c . - "We Build eBusinesses" 
7000 Central Parkway, Suite 1700
Atlanta, GA 30328
Tel: 770.350.7998 ext. 506 / Fax: 770.350.9409
http://www.aismedia.com / [EMAIL PROTECTED]
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~



-------------------------------------------------------
This SF.Net email is sponsored by Oracle Space Sweepstakes
Want to be the first software developer in space?
Enter now for the Oracle Space Sweepstakes!
http://ads.osdn.com/?ad_id=7393&alloc_id=16281&op=click
_______________________________________________
Bacula-users mailing list
Bacula-users@lists.sourceforge.net
https://lists.sourceforge.net/lists/listinfo/bacula-users

Reply via email to