Hi. I'm testing Bacula 1.38.9 on Gentoo 2006.1 and I'm a little confused here.
What I would like to achieve is to be able to run a job concurrently with the same job's different levels. For example, when there's a full backup running for a week, it'd be possible to run incrementals or differentials at the same time (based on the last successful full backup), so that I wouldn't lose that week's differentials (that will run right after the full backup completes, but then there wouldn't be much use of them, would there?). So I have to enable at least 2 concurrent jobs for the job, right? The problem is that every job can have only 1 Device (through Storage) assigned to it, so it isn't actually possible to run the same job concurrently as Device doesn't have the "maximum concurrent jobs" directive. Can my goal be achieved in some other way? Silver ------------------------------------------------------------------------- Using Tomcat but need to do more? Need to support web services, security? Get stuff done quickly with pre-integrated technology to make your job easier Download IBM WebSphere Application Server v.1.0.1 based on Apache Geronimo http://sel.as-us.falkag.net/sel?cmd=lnk&kid=120709&bid=263057&dat=121642 _______________________________________________ Bacula-users mailing list Bacula-users@lists.sourceforge.net https://lists.sourceforge.net/lists/listinfo/bacula-users