On 8/10/07, Marc Schiffbauer <[EMAIL PROTECTED]> wrote:
> * John Drescher schrieb am 10.08.07 um 14:30 Uhr:
>
> Hi John,
>
> > Do you have
> >
> > On 8/10/07, Marc Schiffbauer <[EMAIL PROTECTED]> wrote:
> > > Hi all,
> > >
> > > my director (2.0.3) does not run two "independent" jobs
> > > simultaneously.
> > >
> > > I have set "Maximum Concurrent Jobs = 10" in the Director{}
> > > ressource, but this seems to have no effect.
> > >
> > > The strange thing is that I only try to run two different jobs which
> > > write to two different storages at the same time, which should be no
> > > problem at all.
> >
> > Are both jobs in the same pool?
>
> No.
> (Job1 is Tapebackup (Pool Default set in the JobDefs) and Job2 is
> Diskbackup (Pool VestaFtp set in the Job) ...)
>
Sorry, I missed that. I have been puzzled by this since you posted it
a few days back but I do not have a lot of ideas because Concurrency
works for me. Although I only use it with tape.

John

-------------------------------------------------------------------------
This SF.net email is sponsored by: Splunk Inc.
Still grepping through log files to find problems?  Stop.
Now Search log events and configuration files using AJAX and a browser.
Download your FREE copy of Splunk now >>  http://get.splunk.com/
_______________________________________________
Bacula-users mailing list
Bacula-users@lists.sourceforge.net
https://lists.sourceforge.net/lists/listinfo/bacula-users

Reply via email to