Hello Scott,

Scott Graves <[EMAIL PROTECTED]> writes:

> I have a full backup scheduled monthly with incremental daily. Space is
> limited, so I would like to delete the previous months backup prior to the
> scheduled full. At the moment, I am doing this manually. Is there a way to
> automate this process?

You could recycle your volume files, set all retention (volume, job,
files) periods less than a month, set AutoPrune = Yes, Recycle = Yes and
set a limit to the pool Maximum Volume Bytes = xxx and Maximum Volumes =
y such that xxx times y matches the size you want to invest in your
backups.

Where to place all those directives? I don't know out of my mind, read
the manual as I would have to do to tell you ...

mfg

Eric

Attachment: pgp0gNQ6k0RFy.pgp
Description: PGP signature

-------------------------------------------------------------------------
This SF.net email is sponsored by: Microsoft
Defy all challenges. Microsoft(R) Visual Studio 2005.
http://clk.atdmt.com/MRT/go/vse0120000070mrt/direct/01/
_______________________________________________
Bacula-users mailing list
Bacula-users@lists.sourceforge.net
https://lists.sourceforge.net/lists/listinfo/bacula-users

Reply via email to