Am 25.09.26 um 16:04 schrieb Gabriel Menini:
Have you considered deduplication for this kind of "static jobs"
Not yet, no. Thanks for the pointer, I will look into that.
I was thinking of a second schedule with FULLs only every 4-6 weeks or so, and then assign that to these long-running jobs.
I still don't know if I should add a new JobDef or only edit the individual jobs.
Maybe even add a second pool with longer retention but I'd like to avoid that: I want a longer history for the dynamic jobs so they should be spread over all the ~20 tapes in rotation right now.
_______________________________________________ Bacula-users mailing list [email protected] https://lists.sourceforge.net/lists/listinfo/bacula-users
