Job {
  Name = "Backup_Mouse1"
  JobDefs = "Podstawowe_zadanie2"
  Pool = LTO-Pool
  Storage = LTO-Storage
  Schedule = "tygodniowy_w_poniedzialek_start"
  FileSet="mouse1"
}

FileSet {
  Name="mouse1"
  Include {
     Options {
       signature=MD5
     }
    File="/home/magazyn/"
   }
}

Schedule {
  Name = "tygodniowy_w_poniedzialek_start"
  Run = mon at 08:20
}

Client {
  Name = bareos-fd
  Address = 127.0.0.1

  #File Retention = 30 days            # 30 days
  #Job Retention = 6 months            # six months
  AutoPrune = no                      # Prune expired Jobs/Files
}

Pool {
  Name = LTO-Pool
  Pool Type = Backup
  Recycle = yes                       # Bareos can automatically recycle Volumes
  AutoPrune = yes                     # Prune expired volumes
  #Volume Retention = 3 hours
  #Volume Use Duration = 2 hours
  Storage = LTO-Storage
  Volume Retention = 12 Days
  Next Pool = LTO-Pool-2
}

Pool {
  Name = LTO-Pool-2
  Pool Type = Backup
  Recycle = yes
  AutoPrune = yes
  Storage = LTO-Storage
  Volume Retention = 12 Days
  Next Pool = LTO-Pool-3
}

Pool {
  Name = LTO-Pool-3
  Pool Type = Backup
  Recycle = yes
  AutoPrune = yes
  Storage = LTO-Storage
  Volume Retention = 12 Days
  Next Pool = LTO-Pool
}


I have a 15 LTO tapes, divided them into 3 sets and I would like to work above 
the loop by making the 3 week.
it means:
1 week LTO-Pool
2 weeks LTO-Pool-2
3 weeks LTO-Pool-3

Can someone point out where I made a mistake, possibly a hint what I had to do 
???

-- 
You received this message because you are subscribed to the Google Groups 
"bareos-users" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to [email protected].
To post to this group, send email to [email protected].
For more options, visit https://groups.google.com/d/optout.

Reply via email to