Hi, i wan't to use three schedules. The standard schedule does backups nearly each day (full 1. sat, diff 2.-5.sat, inc mo-fr). My "monthlyCycle" will only do a full backup on the 1. sat and my "manuallyCycle" does - as the name says - only a backup, if I (or a colleague) manually start it. For each schedule I have a different job and fileset, so that different files can be backuped at different times with these schema. For the first two schedules I have set Volume Retention e.g. for Full to 62 days. This works good, but now I have a problem with the manually Cycle. I don't know, how often it will be used. So I can't say, that the job should be erased in x days. Is there any possibility to chance the behaviour, that I have two manually backups each? One should be an older one (if the backuop I just started has an error), and one the actually that I just started.
-- You received this message because you are subscribed to the Google Groups "bareos-users" group. To unsubscribe from this group and stop receiving emails from it, send an email to [email protected]. To post to this group, send email to [email protected]. For more options, visit https://groups.google.com/d/optout.
