Hi,
i wan't to use three schedules. The standard schedule does backups nearly each 
day (full 1. sat, diff 2.-5.sat, inc mo-fr). My "monthlyCycle" will only do a 
full backup on the 1. sat and my "manuallyCycle" does - as the name says - only 
a backup, if I (or a colleague) manually start it. For each schedule I have a 
different job and fileset, so that different files can be backuped at different 
times with these schema.
For the first two schedules I have set Volume Retention e.g. for Full to 62 
days. This works good, but now I have a problem with the manually Cycle. I 
don't know, how often it will be used. So I can't say, that the job should be 
erased in x days. 
Is there any possibility to chance the behaviour, that I have two manually 
backups each? One should be an older one (if the backuop I just started has an 
error), and one the actually that I just started.

-- 
You received this message because you are subscribed to the Google Groups 
"bareos-users" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to [email protected].
To post to this group, send email to [email protected].
For more options, visit https://groups.google.com/d/optout.

Reply via email to