We are using copy jobs to create a second copy of many jobs into a pool that
has a much shorter retention and use duration.
Pool {
Name = Offsite
Pool Type = Backup
Recycle = yes
Recycle Pool = Scratch
Auto Prune = yes
Volume Retention = 3 months
Volume Use Duration = 1 months
Storage = Tand-LTO5-Lib
}
I would like to be notified when a volumes use duration is hit so the operator
can go down and eject the volumes from the library to give the off site
courier.
Is there a way to do this for only specific pools? Right now any operator
notifications are all for when a new disk volume needs a label.
Thoughts? Thanks
Brock Palen
1 (989) 277-6075
[email protected]
www.mlds-networks.com
Websites, Linux, Hosting, Joomla, Consulting
--
You received this message because you are subscribed to the Google Groups
"bareos-users" group.
To unsubscribe from this group and stop receiving emails from it, send an email
to [email protected].
To post to this group, send email to [email protected].
For more options, visit https://groups.google.com/d/optout.