Hello, i'm a little bit confused about this message in bareos (version 17.2.7). At the first Weekend of every Month a lot of archive Jobs starting to storage1 (Tape Library). All of them are starting with default pririty at the same time. The complete Archive Jobs take a while (~ 5 days).
The same clients have a full job sheduling on every weekend and daily incrementel backups to a different storage (also a Tape Library). All storages uses one huge scratch spool Directory. I expect that 6 Jobs are running concurrently (3 jobs on each storage resource) but only 3 are running on only one storage resource. Settings: bareos-sd: Maximum Concurrent Jobs = 20 bareos-dir: Maximum Concurrent Jobs = 6 storage/storage1 and storage2, each of them Maximum Concurrent Jobs = 3 Any ideas? Thanks! greets Steffen -- You received this message because you are subscribed to the Google Groups "bareos-users" group. To unsubscribe from this group and stop receiving emails from it, send an email to [email protected]. To post to this group, send email to [email protected]. To view this discussion on the web visit https://groups.google.com/d/msgid/bareos-users/a8ea3f1581a6a9c5170542526c2a1817a71335e3.camel%40patronas.com. For more options, visit https://groups.google.com/d/optout.
