Hello,

i'm a little bit confused about this message in bareos (version
17.2.7). At the first Weekend of every Month a lot of archive Jobs
starting to storage1 (Tape Library). All of them are starting with
default pririty at the same time. The complete Archive Jobs take a
while (~ 5 days).

The same clients have a full job sheduling on every weekend and daily
incrementel backups to a different storage (also a Tape Library).

All storages uses one huge scratch spool Directory. I expect that 6
Jobs are running concurrently (3 jobs on each storage resource) but
only 3 are running on only one storage resource.

Settings:

bareos-sd:
  Maximum Concurrent Jobs = 20

bareos-dir:
  Maximum Concurrent Jobs = 6

storage/storage1 and storage2, each of them
Maximum Concurrent Jobs = 3


Any ideas? Thanks!

greets

Steffen




-- 
You received this message because you are subscribed to the Google Groups 
"bareos-users" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to [email protected].
To post to this group, send email to [email protected].
To view this discussion on the web visit 
https://groups.google.com/d/msgid/bareos-users/a8ea3f1581a6a9c5170542526c2a1817a71335e3.camel%40patronas.com.
For more options, visit https://groups.google.com/d/optout.

Reply via email to