On Tue, Jul 8, 2014 at 9:37 AM, Immutant <[email protected]> wrote:
> Erm, sure.
>
> The Rev C I got is the Element14 one. I bought it from the Element14
> Singapore website at this link on 14/05/2014:
>
> goo.gl/ykI5pf (Link is down because element14 is down).
>
> The strange thing was that, when I placed the order, they told me that there
> is a lead time of 8 to 10 weeks (had to confirm 2x, 1 via email, and 1 via
> phone to place my order). Then surprisingly, I got the physical BBB package
> on 15/05/2014, which was the next day.
>
> http://paste.debian.net/108705
> http://paste.debian.net/108707/

you can fix /etc/init.d/led_aging.sh via:

https://gist.github.com/RobertCNelson/337a72924a44ed414e06

>
> My second BBB had no problem though. I made the order for it on 09/06/2014
> and got it on 27/06/2014.

They probably moved to a later image. I'm in no control with these guys.

The latest is always available here.

http://beagleboard.org/latest-images

Regards,

-- 
Robert Nelson
http://www.rcn-ee.com/

-- 
For more options, visit http://beagleboard.org/discuss
--- 
You received this message because you are subscribed to the Google Groups 
"BeagleBoard" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to [email protected].
For more options, visit https://groups.google.com/d/optout.

Reply via email to