Hi,

I making some DMA examples with connection between PRU and ARM. 

So I need to measure the time between two PRU code commands.

The simplest way to do it on the ARM side is using library *time* or 
something like that.

Are there some software method to do the same on the PRU side?

-- 
For more options, visit http://beagleboard.org/discuss
--- 
You received this message because you are subscribed to the Google Groups 
"BeagleBoard" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to [email protected].
To view this discussion on the web visit 
https://groups.google.com/d/msgid/beagleboard/c793ebcb-291f-43c8-bb82-a26b6c63a355%40googlegroups.com.
For more options, visit https://groups.google.com/d/optout.

Reply via email to