On Thu, Jun 23, 2011 at 7:59 AM, VidJa <[email protected]> wrote:
> The only 'solution' I came up to is to loop over all tubes I'm
> watching and 'ignore' those tubes I don't want to get jobs from at
> that particular moment. Then later on I have to start watching all of
> them again.

That is how to do it.

> Is there a method to get a job from a specific tube without first
> ignoring the rest?

Not in the same connection.

kr

-- 
You received this message because you are subscribed to the Google Groups 
"beanstalk-talk" group.
To post to this group, send email to [email protected].
To unsubscribe from this group, send email to 
[email protected].
For more options, visit this group at 
http://groups.google.com/group/beanstalk-talk?hl=en.

Reply via email to