On Thu, Jun 23, 2011 at 7:59 AM, VidJa <[email protected]> wrote: > The only 'solution' I came up to is to loop over all tubes I'm > watching and 'ignore' those tubes I don't want to get jobs from at > that particular moment. Then later on I have to start watching all of > them again.
That is how to do it. > Is there a method to get a job from a specific tube without first > ignoring the rest? Not in the same connection. kr -- You received this message because you are subscribed to the Google Groups "beanstalk-talk" group. To post to this group, send email to [email protected]. To unsubscribe from this group, send email to [email protected]. For more options, visit this group at http://groups.google.com/group/beanstalk-talk?hl=en.
