Here are the notes from today's Blender 2.8 planning meeting. = Last week =
- Bastien was mainly busy with tracker/2.79 tasks. Detailed report https://wiki.blender.org/index.php/User:Mont29/Foundation/2017#Week_204_-_08.2F05_to_08.2F11 - Campbell was doing more work on manipualtors, going through TODO list, mainly compositor sun-beam, image-empty and compositor corner pin. also investigated boolean bug. Detailed report http://download.blender.org/ftp/ideasman42/donelist/2017.html#week-334-august-7 - Clement finished ScreenSpace Refraction and did some improvement on SSR and GTAO. Detailed report https://wiki.blender.org/index.php/User:Hypersomniac/Foundation/2017#Week_35:_7th_-_13th_August - Dalai was still on vacation, nothing to report. - Luca was working on the physics nodes proof of concept, but the project ended up suffering some major conceptual changes, and expanded quite a bit. - Sergey was mainly bugfixing in own areas, for 2.79. Detailed report https://wiki.blender.org/index.php/User:Nazg-gul/Foundation/2017#Week_297:_7th_-_13th_August = This week planning = - Everyone will be focused on updating planning for the remaining months of this year. - Bastien will need to do some 2.79 tasks for RC2. At the remaining time asset engine wrap up. - Campbell is planing to new project, since manipulators are dragging for too long. Still some TODOs from the list to be addressed tho. - Clement finish GTAO optimization. Then do some polishing on existing features. Use random sampling for OGL render (aka fix the noise). Then investigate TAA (temporal anti-aliasing). - Dalai will be catching up a bit on 2.8 projects (see how things went those past 3 weeks), revisit Eevee planning, and plan own next weeks/months. There are some unrevisited collection/group instance implementation which needs finishing / reviewing. He is also is interested on grabbing the Eevee sample files bundle, and put it online too (need to talk to Ton about that). - Luca will keep working on the nodes project (which is now a bit more generic than physics nodes). By the end of the week, will have an initial implementation, and a clear idea of how this will integrate with Blender, both on a code and on a user level. - Sergey will also do 2.79 RC2 tasks (gather revisions, backport, ahoy, tag). Talk to Dalai about some issues with collections/layer, which needed workarounds on copy-on-write. get Then get back to animation support / stability in 2.8 branch for the remaining time. Note for everyone: Blender 2.8 tracker is currently for developers to coordinate core development. We can not spend time on fixing users reports yet: lots of them are requiring core parts to be finished redesigning first. -- With best regards, Sergey Sharybin _______________________________________________ Bf-committers mailing list [email protected] https://lists.blender.org/mailman/listinfo/bf-committers
