The Mayor (who is not a member of this list) says: >Thanks for sharing this information. I look forward to receipt of the = >report on maintenance of the trail, and I will forward this information to = >the police department with a request that an officer, on bicycle, patrol = >regularly and that the grafitti issue also be addressed. > >Mayor Sue [EMAIL PROTECTED]
At 7:29 AM -0500 9/6/02, Larry Nelson wrote: >George is correct: that portion of the SW Bike Path between Verona Road >and Lovell Lane requires significant maintenance resources. An annual >cleanup is inadequate. The spring cleanup that George participated in was >probably not evident one month after the event. > >I believe the path was swept this week. (The supervisor who manages this >work is off until Monday.) This section of the path is regularly >scheduled for sweeping. > >Yesterday, Tony Fernandez, the Engineering Design Engineer of the SW Path >and Kathy Cryan, Operations Supervisor, presented me with draft >Maintenance Plan, Southwest Bike Path. Practically all the right of way >between Verona Road and Lovell Lane is in the "Level 1" maintenance level, >unlike the rest of the path where only the area in close proximity to the >path is so identified. We will review the plan with George's comments in >mind. > >Finally, on another subject, this past Wednesday the Board of Public Works >recommended the award of the Nob Hill Bike Path Improvement to R.G. Huston >Co., Inc. for $194,210.13. Hopefully, we can get this built yet this year >if the weather is cooperative. > >Larry D. Nelson >City Engineer >[EMAIL PROTECTED] >Telephone 608-267-4227 > _______________________________________________ Bikies mailing list [EMAIL PROTECTED] http://www.danenet.org/mailman/listinfo/bikies
