The Mayor (who is not a member of this list) says:

>Thanks for sharing this information.  I look forward to receipt of the =
>report on maintenance of the trail, and I will forward this information to =
>the police department with a request that an officer, on bicycle, patrol =
>regularly and that the grafitti issue also be addressed.
>
>Mayor Sue
[EMAIL PROTECTED]



At 7:29 AM -0500 9/6/02, Larry Nelson wrote:
>George is correct: that portion of the SW Bike Path between Verona Road
>and Lovell Lane requires significant maintenance resources.  An annual
>cleanup is inadequate.  The spring cleanup that George participated in was
>probably not evident one month after the event.
>
>I believe the path was swept this week.  (The supervisor who manages this
>work is off until Monday.)  This section of the path is regularly
>scheduled for sweeping.
>
>Yesterday, Tony Fernandez, the Engineering Design Engineer of the SW Path
>and Kathy Cryan, Operations Supervisor, presented me with draft
>Maintenance Plan, Southwest Bike Path.  Practically all the right of way
>between Verona Road and Lovell Lane is in the "Level 1" maintenance level,
>unlike the rest of the path where only the area in close proximity to the
>path is so identified.  We will review the plan with George's comments in
>mind.
>
>Finally, on another subject, this past Wednesday the Board of Public Works
>recommended the award of the Nob Hill Bike Path Improvement to R.G. Huston
>Co., Inc. for $194,210.13.  Hopefully, we can get this built yet this year
>if the weather is cooperative.
>
>Larry D. Nelson
>City Engineer
>[EMAIL PROTECTED]
>Telephone 608-267-4227
>