On 20 Nov 2008 at 18:51, Nelson, Larry wrote:

> I believe that the bike trail along the rail corridor between the Village of 
> Shorewood Hills and Middleton could be constructed in 2013 - 2014, if there 
> was support.  
Thus far, we have some interest expressed by Middleton staff but we are lacking 
the biking 
support we enjoyed for the SW Bike Trail Missing Link.  
Compromise does not build bike paths...

Sure, such a bike trail would be nice.  I bike from Shorewood Hills to 
Middleton once a 
month via Old Middleton Road.  I find this route acceptable, and once I am past 
the Old 
Sauk Road intersection, it is almost pleasant with modest car travel - EXCEPT 
that stretch 
from Capitol Ave to the Middleton city limit. The pavement is a bouncy blacktop 
jumble. Its 
one-foot wide ped/bike lanes are overgrown by bushes, and a mailbox blocks it 
in one place.
Instead of asking for or dreaming about a pie-in-the-sky, way-off-in-the-future 
trail overbuilt 
to expensive federal(?) standards, I'd rather have soon a decently surfaced Old 
Middleton 
with bushes trimmed.  Much cheaper than the trail, and adequate for the small 
group, 
unfortunately, of long-distance bike commuters.

-- 
Michael von Schneidemesser (aka Mike vons)
3555 Tally Ho Lane, Madison,WI 53705-2126, USA
+608 233-3051
_______________________________________________
Bikies mailing list
[email protected]
http://lists.danenet.org/listinfo.cgi/bikies-danenet.org

Reply via email to