Along with Tim's input, I certainly hope that extending the Capital City Trail 
to the village of Cottage Grove has not been abandoned.  I know that property 
has been purchased from landowners whose property abuts the rail line between 
Madison and Cottage Grove.  I also know that despite ample monetary offers, 
Union Pacific has refused to sell right-of-way for bike trails within the city 
of Madison.  Is significant right-of-way necessary from Union Pacific to 
complete the path to Cottage Grove?


--- On Mon, 9/7/09, tim wong <[email protected]> wrote:

> From: tim wong <[email protected]>
> Subject: Re: [Bikies] Biking Infrastructure
> To: "Larry D. Nelson" <[email protected]>
> Cc: "BikiesSubmissions" <[email protected]>
> Date: Monday, September 7, 2009, 3:56 PM
> Speaking of biking infrastructure, the east
> side rail corridor trail is in bad need of
> reconstruction/paving between Marquette and, I think,
> Tulane.  Some short sections were redone this summer, but
> the trail seems to be coming apart at the seams.  Those
> "bumps" where the two seams no longer meet are
> really hard on a bike, especially a road bike.  The trail
> should probably also be widened at least two feet.
> 
> 
> On 9/7/09, Larry D. Nelson <[email protected]>
> wrote:
> With the important exceptions of a stronger connection to
> the North side and
>  the Northeast side of the City of Madison, the
> infrastructure is largely in
>  place to offer those in SOV to bike.
>  
>  The emphasis now is to connect the system to other
> municipalities and there
> 
>  are three major projects on the boards to do just that:
>  
>  1.  The Lower Yahara Trail, which will connect the
> Village of McFarland to
>  Madison;
>  
>  2.  The Cannonball Trail, which will connect Fitchburg
> and Verona to Madison
> 
>  (and the residents of Madison south of the Beltline
> Highway to Madison);
>  and,
>  
>  3.  The paving of the Badger Trail, which will connect
> Paoli and Bellville
>  to Madison.
>  
>  In addition to expanding the system, we need to maintain
> the current system,
> 
>  which was initially laid out in the early 1970s.  When
> the pavement is
>  replaced or resurfaced, the corridors are brought up to
> current standards
>  for safety and traffic projections...just like roads.
>  
>  What is the range that we can expect most users to
> consider for commuter
> 
>  biking?  Perhaps the maximum is 10-miles, one way. The
> SW Trail was measured
>  last year with 2500 users, which is equivalent to a
> collector street.
>  
>  Planners for biking infrastructure need to be cognizant
> that, while Madison
> 
>  may enjoy a growth in population, jobs within Madison may
> not be growing.
>  We, unfortunately, need to await the results of the
> decadal census, which we
>  will not have the results until 2012 but it is likely that
> these corridors
> 
>  will be used by Madisonians to commute to jobs outside of
> the City.
>  
>  Fortunately, funding for bike paths has been available
> since the 1990 ISTEA
>  Act.  But, a good plan and public support is required to
> obtain funding.
> 
>  Frankly, one of the challenges of constructing biking
> infrastructure is that
>  veteran bikers often want to compete with  cars on
> roadways and the people
>  we want to offer an alternative to the SOV are not aware
> of the potential.
> 
>  
>  _______________________________________________
>  Bikies mailing list
>  [email protected]
>  http://lists.danenet.org/listinfo.cgi/bikies-danenet.org
> 
>  
> 
> 
> -----Inline Attachment Follows-----
> 
> _______________________________________________
> Bikies mailing list
> [email protected]
> http://lists.danenet.org/listinfo.cgi/bikies-danenet.org
> 
_______________________________________________
Bikies mailing list
[email protected]
http://lists.danenet.org/listinfo.cgi/bikies-danenet.org

Reply via email to