Well,

We might have to wait until 2014 for the intersection to be reconfigured.  That 
is not an excuse to wait on making this a safer intersection.  This spring 
would not be too soon to have bike boxes and bike lanes painted in.  Lanes for 
turning cyclists are essential as well.  And a few highly visible signs 
bringing driver's attention to the bikeway x-ing would be helpful.

-india

***********************
India Viola
UW-Madison 
Stretton Lab
115 Zoology Research Bldg.
1117 W. Johnson St.
Madison, WI 53706
608.262.3336
***********************

"How can we learn from our mistakes if we don't first acknowledge them?" 
-Anonymous

"We exist in the bacterial world, not bacteria in ours" -Stuart Levy

----- Original Message -----
From: "Schaefer, William" <[email protected]>
Date: Thursday, December 3, 2009 10:56 am
Subject: Re: [Bikies] More on Monroe-Regent intersection
To: 'Robbie Webber' <[email protected]>, Bikies <[email protected]>


> The schedule for reconstructing the intersection has been pushed back 
> to 2014. I don't know why other than the complicated nature of the project.
> 
> -----Original Message-----
> From: [email protected] 
> [mailto:[email protected]] On Behalf Of Robbie Webber
> Sent: Thursday, December 03, 2009 10:53 AM
> To: Bikies
> Subject: [Bikies] More on Monroe-Regent intersection
> 
> I am trying to get information on city plans for this intersection. I
> think it is supposed to be rebuilt soon - 2010 or 2011 - but I am
> chekcing to be sure.
> 
> A few years back there were a couple of meetings about this
> intersection. At that time, the UW wanted to extend the plaza in front
> of the Field House, and purchase some right of way from the city to do
> so. This would have eliminated Little St (that right turn lane from WB
> Monroe to Regent has an actual name.) However, after meeting with the
> three affected neighborhoods and the pedestrian and bicycle users, the
> consensus was that non-motorized users preferred to have the WB right
> turning cars out of the line of travel for SW Path users. (One of the
> few times I recall a flying right being considered a good thing for
> ped/bike users.)
> 
> Later, Traffic Engineering and City Engineering held a meeting about
> other possible fixes, such as a tunnel for the SW Path. The options
> they showed were really very good, covering the concerns about being
> too enclosed in a tunnel, the need to be able to transition to other
> streets from the path, etc. I am guessing that the plans for the
> tunnel were shelved for a number of reasons: cost, the uncertainty of
> the utilities underneath, massive disruption of the area to construct
> it, etc.
> 
> I am fairly certain that bike boxes are planned for all four legs of
> the Monroe-Regent intersection. I am not certain what else is in the
> works, but I have written to the three alders representing the area
> (Julia, Brian, and Shiva) as well as Traffic Engineering and City
> Engineering. I'll let you know when I find out what is up. I also
> suggested that perhaps a meeting to explain the options and time line
> might be appropriate.
> 
> Perhaps one of the Bikies or lurkers from the city staff could help
> enlighten us?
> 
> Robbie Webber
> Bike Walk Madison Steering Committee
>   www.bikewalkmadison.org
> Join our group on Facebook!
> _______________________________________________
> Bikies mailing list
> [email protected]
> http://lists.danenet.org/listinfo.cgi/bikies-danenet.org
> _______________________________________________
> Bikies mailing list
> [email protected]
> http://lists.danenet.org/listinfo.cgi/bikies-danenet.org
_______________________________________________
Bikies mailing list
[email protected]
http://lists.danenet.org/listinfo.cgi/bikies-danenet.org

Reply via email to