This statement was just sent from Anne Monks, one of the Mayor's Assistants:
The Mayor’s blog has been corrected. The bike station is part of the block 88/105 study now starting. The draft 2012 capital budget included dollars for design of the bike station. There has been some discussion about whether it was possible those dollars would be needed in 2012. That is the origin of the reference. Any questions let me know. Anne -- ________________________ Amanda White Associate Director Bicycle Federation of Wisconsin (608) 251-4456 [email protected] www.bfw.org
_______________________________________________ Bikies mailing list [email protected] http://lists.danenet.org/listinfo.cgi/bikies-danenet.org
