Kepada Yth:
Bpk./Ibu 
Di Tempat

Hal : Penawaran Batu Bara

Dengan hormat,
Bersama ini kami yang berkedudukan di Samarinda, Kalimantan Timur dan bergerak 
di bidang perdagangan batu bara, ingin mengajukan penawaran komoditas sebagai 
berikut :

FULL CORPORATE OFFER

Date            : 22 Mei 2009
Commodity       : Steam Coal
1. COAL QUALITY SPESIFICATION 5800-5600 FOB Barge
•       GCV Kcal/kg     5800-5600
•       TM (arb)%       19.39
•       IM (adb)%       7.69
•       Ash (adb)%      1.97
•       VM (adb)%       29.59
•       FC %            28.31
•       TS (adb)%       0.8
•       HGI             45-50
•       Size %          90
•       Price USD       48
Price FOB MV 55 U$D
Summary mining location :
- Commodity             : Indonesian Steaming Coal
- Origin                : East Kalimantan – Kalimantan Timur
- Mining to Jetty       : +/- 1 KM
- Port of Loading       : Sungai Mahakam 300 feet
- Anchorage point       : Muara Jawa
- Production Planning   : 30 – 40 days
- Quantity production   : 30.000 – 40.000 MT
- Ready stock           : 16.000 MT
- Insurance             : Buyer

2. COAL QUALITY SPESIFICATION 5500-5300 FOB MV 
•       GCV Kcal/kg     5500-5300
•       TM (arb)%       25.26
•       IM (adb)%       15.77
•       Ash (adb)%      2.09
•       VM (adb)%       42.30
•       FC %            39.84
•       TS (adb)%       0.44
•       HGI             48
•       Size %          90
•       Price USD       43
 Price FOB barge Rp. 350.000,-
Summary mining location :
- Commodity             : Indonesian Steaming Coal
- Origin                : East Kalimantan – Kalimantan Timur
- Mining to Jetty       : +/- 2 KM
- Port of Loading       : Sungai Ryco 300 feet
- Anchorage point       : Teluk Balikpapan (2-3 Hours Jetty to Anchorage Point 
/ Vessel)
- Loading Rate          : 4.000 – 5.000 MT/Days
- Quantity production   : 30.000 – 60.000 MT / Month
- Length of Contract    : Minimum 1 (one) Years
- Insurance             : Buyer

3. COAL QUALITY SPESIFICATION 6300-6100 FOB Barge
•       GCV Kcal/kg     6292
•       TM (arb)%       19.93
•       IM (adb)%       16.86
•       Ash (adb)%      2.09
•       VM (adb)%       40.05
•       FC %            41
•       TS (adb)%       0.74
•       HGI             45-50
•       Size %          90
•       Price USD       63
Price FOB MV 70 U$D
Summary mining location :
- Commodity             : Indonesian-Steaming Coal
- Origin                : East Kalimantan – Kalimantan Timur
- Mining to Jetty       : +/- 22 KM
- Port of Loading       : Muan River, Max 300 feet Barge
- Anchorage point       : Teluk Balikpapan (8-10 Hours Jetty to Anchorage Point 
/ Vessel)
- Loading Rate          : 2.500 – 3.000 MT/Days
- Quantity production   : 40.000 – 60.000 MT / Month
- Length of Contract    : Minimum 1 (one) Years
- Insurance             : Buyer

 Pembayaran untuk FOB barge / Tongkang di lakukan dengan cara :
-  50% dari harga dibayar pada saat kontrak
-  40% dari harga dibayar pada saat mulai loading ke pontoon
-  10% dari harga dibayar pada saat seluruh cargo selesai dimuat ke ponton dan 
dokumen-dokumen pendukung telah di keluarkan.

Demikian surat penawaran dari kami dengan speak yang kami punya, terima kasih 
atas perhatian dan kerjasamanya, kami tunggu kabar dari bapak selanjutnya.

Hormat saya,



Febry Chairuddin
HP      : +62811-1774588
Email   : chairudin.fe...@yahoo.com
Email   : chairudin.fe...@gmail.com



Kirim email ke