#11209: Net::SSLeay-1.85 tests hanging.
-------------------------+-----------------------
Reporter: ken@… | Owner: ken@…
Type: enhancement | Status: assigned
Priority: normal | Milestone: 8.4
Component: BOOK | Version: SVN
Severity: normal | Resolution:
Keywords: |
-------------------------+-----------------------
Comment (by ken@…):
Curiouser and curiouser. It might be some option in the kernel config
which causes the hang.
On the old AMD machine where LFS-8.3 and 4.18.5 worked, updating the
kernel to 4.18.12 continued to work.
But on the old intel where 8.3 and 4.18.6 hung, updating to 4.18.12 still
hung.
Similarly, on the recent AMD with svn where the tests hung with 4.18.9,
updating to 4.18.12 still hangs.
But the CPAN ticket said that there were a lot of test failures with
openssl-1.1.1 so I think we need to update to 1.86_06 pending a final
release of 1.86.
However, using this with IO-Socket-SSL-2.060 and current svn I get a test
failure in IO-Socket-SSL-2.060 :
{{{
Test Summary Report
-------------------
t/compatibility.t (Wstat: 13 Tests: 7 Failed: 0)
Non-zero wait status: 13
Parse errors: Bad plan. You planned 9 tests but ran 7.
Files=38, Tests=778, 55 wallclock secs ( 0.11 usr 0.02 sys + 4.12 cusr
0.41 csys = 4.66 CPU)
Result: FAIL
Failed 1/38 test programs. 0/778 subtests failed.
make: *** [Makefile:879: test_dynamic] Error 255
}}}
So I no-longer feel confident about any of this.
with 1.86_06 and 2.059 I'm getting different failures:
{{{
Test Summary Report
-------------------
t/ecdhe.t (Wstat: 0 Tests: 4 Failed: 1)
Failed test: 3
t/npn.t (Wstat: 0 Tests: 5 Failed: 2)
Failed tests: 4-5
t/protocol_version.t (Wstat: 65024 Tests: 2 Failed: 1)
Failed test: 1
Non-zero exit status: 254
Parse errors: Tests out of sequence. Found (1) but expected (2)
No plan found in TAP output
t/session_ticket.t (Wstat: 768 Tests: 6 Failed: 3)
Failed tests: 2-3, 6
Non-zero exit status: 3
t/sni_verify.t (Wstat: 13 Tests: 5 Failed: 2)
Failed tests: 4-5
Non-zero wait status: 13
Parse errors: Bad plan. You planned 17 tests but ran 5.
Files=38, Tests=757, 71 wallclock secs ( 0.12 usr 0.02 sys + 3.88 cusr
0.42 csys = 4.44 CPU)
Result: FAIL
Failed 5/38 test programs. 9/757 subtests failed.
make: *** [Makefile:879: test_dynamic] Error 255
}}}
Even if we upgrade IO-SSLeay for openssl-1.1.1, the test results for IO-
Socket-SSL are broken whether we use the old or new versions.
Hopefully, there will be a real Net-SSLeay release soon.
Or, we could just revert openssl-1.1.1 in LFS. ;-)
--
Ticket URL: <http://wiki.linuxfromscratch.org/blfs/ticket/11209#comment:2>
BLFS Trac <http://wiki.linuxfromscratch.org/blfs>
Beyond Linux From Scratch
--
http://lists.linuxfromscratch.org/listinfo/blfs-book
FAQ: http://www.linuxfromscratch.org/blfs/faq.html
Unsubscribe: See the above information page