Hi Bill,

Examine the spacing between the other sections, you will want to get similar 
spacing for the sake of appearance. Usually the spacing will be a three 
quarters thick board,
commonly a strip of plywood or a length of so-called 1 by 4. These may be left 
behind often because they are about impossible to remove, if they are removed 
they will be often replaced with some sort of tar or packed in a little sand.

The purpose of the spacers is to allow movement without breaking up the entire 
walkway.

The sides can be modest where the walk is depressed into the surrounding ground 
so long as you can get them tightly and securely placed by packing them around 
the outside. The cement will keep them firmly against the sides of the 
excavation.

The new cement will be obvious for a couple of years partly by texture and 
partly by colour but on the other hand it shows that someone is taking care of 
maintenance.

Hope this helps.

Dale Leavens, Cochrane Ontario Canada
[EMAIL PROTECTED]
Skype DaleLeavens
Come and meet Aurora, Nakita and Nanook at our polar bear habitat.


  ----- Original Message ----- 
  From: Bill Gallik 
  To: [email protected] 
  Sent: Thursday, May 24, 2007 2:50 AM
  Subject: Re: [BlindHandyMan] pouring cement stairs.


  Since we're on the subject of pouring concrete I have a project that could
  use an informed tip. The sidewalk section that butts up to the bottom of my
  concrete steps into the house is badly shifted and I want to replace it with
  a newly poured section.

  The shifted section is 36" by 24" and of course there are two adjacent
  sections of sidewalk as well as the steps. I was hoping I could just put a
  board where the "naked" side of this sidewalk section is and pour new
  concrete, but I'm not sure what I should do about the neighboring concrete;
  the two pre-existing sidewalk sections and the bottom of the steps.

  Can I pour the new concrete so it's in contact with the three older items or
  do I need to put some type of separating material between them? If I need
  to put some type of separating material between the new concrete and the old
  what would be best to use and how thick would it need to be? I would imagine
  that if I need some type of separator the thinner the better (to a point of
  course)?
  ----------------
  Bill Gallik
  E-Mail: [EMAIL PROTECTED]
  God made man before woman so as to give him time to think of an answer for
  her first question.
  * * * * * * *
  - "The secret of a good sermon is to have a good beginning and a good
  ending; and to have the two as close together as possible."
  - George Burns



   

[Non-text portions of this message have been removed]



To listen to the show archives go to link
 http://acbradio.org/handyman.html
or
ftp://ftp.acbradio.org/acbradio-archives/handyman/

The Pod Cast address for the Blind Handy Man Show is.
http://www.acbradio.org/news/xml/podcast.php?pgm=saturday

The Pod Cast address for the Cooking In The Dark Show is.
http://www.gcast.com/u/cookingindark/main.xml

Visit The Blind Handy Man Files Page To Review Contributions From Various List 
Members At The Following address:
http://www.jaws-users.com/handyman/

Visit the new archives page at the following address
http://www.mail-archive.com/[email protected]/  
For a complete list of email commands pertaining to the Blind Handy Man list 
just send a blank message to:
[EMAIL PROTECTED] 
Yahoo! Groups Links

<*> To visit your group on the web, go to:
    http://groups.yahoo.com/group/blindhandyman/

<*> Your email settings:
    Individual Email | Traditional

<*> To change settings online go to:
    http://groups.yahoo.com/group/blindhandyman/join
    (Yahoo! ID required)

<*> To change settings via email:
    mailto:[EMAIL PROTECTED] 
    mailto:[EMAIL PROTECTED]

<*> To unsubscribe from this group, send an email to:
    [EMAIL PROTECTED]

<*> Your use of Yahoo! Groups is subject to:
    http://docs.yahoo.com/info/terms/
 

Reply via email to