Hi Guys,
 
The project is 99 % done. Saturday i was able to check all of the
electrical. I then had My dad and a couple of Nabors come over and help put
the bed back on the frame. I put some 2 by 4's on top of the frame before
the bed went on. I then, each corner at a time, put the 3 inch lift kit
blocks back on. Once the bed was completely tightened, i neatly ran all of
the wires. I then put the corvette roll pan back on, and plugged in the
bulbs in the pan. The tailgate was the next thing to be put on. I then
washed the truck.
Today i finished the grounds on the wiring harness, put the mud flaps on,
along with the tires. 
The only thing left to do is, reattach the gas fill pipe to the bed, and
adjust the emergency brake cable.  I'm waiting for the breather hose and a
grommet from GM. And once those 2 items come in and i put them on, the
project will be done.
 
It was a productive weekend. Have a great week everyone,
 
Roger C Bachelder 3rd
[EMAIL PROTECTED]
 


[Non-text portions of this message have been removed]

Reply via email to