Q: I'm about to pour a new sidewalk. How long should I let the new concrete
cure before walking on it?

 

A: Generally speaking, concrete and other Portland cement-based products
should be moist-cured for at least 5 to 7 days. Check the product packaging
for specific instructions. One alternative to moist-curing is using an
Acrylic Concrete Sealer. Applied at the appropriate time, this will help the
concrete cure properly while sealing it against stains that tend to
penetrate the surface of the concrete. Note: An acrylic concrete sealer
should not be used in temperatures below 50 degrees F or when rain is
expected within a few hours.

 

 



[Non-text portions of this message have been removed]

Reply via email to