Hi Lee

Well the new toilet has been installed but because it is cemented to the
floor we cannot use it for 24 hours.

We have a potty toilet which is currently in the garden shed but because it
is Winter now removing clothing can be a very cold experience.

I had to extend the roof of the back shed yesterday for I was having
problems with water coming in the rear wall, hopefully I have stopped this
now.

It was because the run off part that was sitting over the guttering was to
small and the water was running over and back under the roof sheeting and
down inside the wall sheets.

Today I have a problem with a window leaking in one corner and it has rotted
the window reveal.

I think I have found where it is coming in so I will seal that off and
inspect all around the window for other entry points.

I will then dig out the rotted wood on the inside and try to see how much
damage has been done.

I will then fill this with wood filler then wait till it has gone off and
sand  it back.

I  have to inspect the roof tiles on one side of the house where they go
over the guttering for the wife says there seems to be water coming down
behind the guttering in some places.

So there is plenty to do at the moment.

Regards'

ray

 

From: [email protected] [mailto:[email protected]]
On Behalf Of Lee A. Stone
Sent: Friday, 5 June 2009 9:58 PM
To: [email protected]
Subject: Re: [BlindHandyMan] Having the Toilet Replaced.

 







I must say Ray as I was reading your post I kept saying to myself" No 
No. oh No" both to the toilet and then when I read " wiring". but it 
is okay as the wiring is outside and the plumbing is inside. . I would 
like to say. as the one who does the bathroom cleaning most of the 
time. we went from the so called normal toilet and with the plumbrs 
suggestion to the little water saver. but Now that I hve traveled a 
bit more since 86. what I would like to have installed is a wall hung 
toilet.. Lee

On Fri, 
Jun 05, 2009 at 07:00:58AM 
+1000, Ray 
Boyce wrote:
> Well the Wife has had her way again and we are replacing the toilet today
> with a lower more modern one.
> 
> I am having the shut off valve replaced at the same time.
> 
> Out here the porcelain pan is cemented to the floor, after installation it
> cannot be used for 24 hours.
> 
> 'The plumbing has to be altered because the pipes will have to come
through
> the wall at the rear.
> 
> Luckily we have what is called a potty toilet to cover us while it is out
of
> action.
> 
> The wiring is all finished in the back shed with the lights connected and
a
> 15 amp circuit in the shed where the caravan is going.
> 
> The Roller Door supposed to be going on today but has been postponed til
> next week because of the rain.
> 
> Like Dan is having done there is plenty going on here to.
> 
> Ray 
> 
> 
> 
> [Non-text portions of this message have been removed]
> 

-- 
Yesterday I was a dog. Today I'm a dog. Tomorrow I'll probably still
be a dog. Sigh! There's so little hope for advancement.
-- Snoopy
.





[Non-text portions of this message have been removed]

Reply via email to