Nothing.
Line your first row up with the edge of the roof, then the second row line
the bottom up with the crotch on the row below it.  The second row should be
offset from the first about 1/3 the length of the shingle, there is a little
notch on the top that will help with this.
Put nails in each end, then one about each crotch, about 3/4 to 1 inch above
the crotch so it ends up in the tar strip.  4 nails per shingle is best in
my opinion.  no nails should be showing when done.
 
Michael


  _____  

From: [email protected] [mailto:[email protected]]
On Behalf Of Ralph Supernaw
Sent: Wednesday, July 08, 2009 11:02 AM
To: [email protected]
Subject: [BlindHandyMan] Shingling the house





Hi,

When shingling a roof, What do you use as a jig to line up the shingles
across the roof?

Thanks,

Ralph

[Non-text portions of this message have been removed]






[Non-text portions of this message have been removed]

Reply via email to