I got tung and groove OSB.  I ordered quote 3/4 tung and groove plywood 
quote but they delivered OSB.  I had been talking to the guy I was 
ordering from, and told him it was for a sub floor.  I also mentioned that 
I was not an experienced carpenter, and he may have made some assumptions. 
I think I would have preferred plywood.

I went with 3/4 just because I am being paranoid about the rigidity of the 
floor because these are 2X4 joists on the flat with a bunch of blocking. 
The joists feel very solid while I am walking around on them, but I did 
not glue the blocking to the cement floor, so I am hoping the decking will 
help keep the joists rigidly in position.

What kind of screw or nail spacing should I use along the joists?

-- 
Blue skies.
Dan Rossi
Carnegie Mellon University.
E-Mail: [email protected]
Tel:    (412) 268-9081

Reply via email to