Seems like this was a slow week.  I roughed in the telephone and cable TV 
wiring.  Put in an additional four way switch in the dining room.  Those top 
plates were accessible from the new room.  Reinstalled the post light we had 
removed from the back yard.  I put it down the hill close to the new walk 
through garage door.  With my son in laws help we finished replanting the 
grass seed.  Think I told everyone the electric rough in in spection went 
fine last week.  Installed a GFI on the outside where I had put some siding 
on.  The ordered soffet material was picked up last night and I finished the 
east side except for the corner.  Is there a particular mold one is to use 
on the miter corners or make square corners on the out side corners???  The 
sun came out today and is really baking the mud, very humid and eighty six. 
so we finally turned the a c on.  The sump pump from the evaporator was 
making a terrible noise so I removed it and am letting the drain go into 5 
gallon buckets until I can look at the pump.  The joys of home ownership.
Ron 


Reply via email to