Hyrum,

Excellent. I'm very happy with those changes. Thanks for that.

Cheers,
    Gary


On 06/12/2012 12:20 PM, Hyrum K Wright wrote:
Yes, many thanks.  I made a couple of trivial edits, and signed off on
the report.  I'll find Greg sometime today and encourage him to review
it as well.  :)

-Hyrum

On Tue, Jun 12, 2012 at 12:58 PM, Joachim Dreimann
<[email protected]>  wrote:
Thanks Gary. I'm happy with the report, seems to reflect the current status
well.

- Joe

On 12 June 2012 11:18, Gary Martin<[email protected]>  wrote:

Hi everyone,

OK, I have thrown some words together from some notes I had and I have
updated our section of the report with the following if anyone would like
to review it:

Bloodhound is an issue tracker derivative of Trac, with the goal of making
deployment easy, and usage intuitive.

Bloodhound has been incubating since December 2011.

The top three issues that need to be addressed to move toward graduation
are
still:

  1. Improving community diversity
  2. Lowering the barrier to entry and development
  3. Creating shippable releases and getting user feedback

Over the last three months there has been significant design and
development
effort into the project, taking the codebase from being a basic installer
to
add a new interface. The front-end design is considered to be complete at
this
stage but more work is required to implement this design. Despite this, the
project remains installable and it has become possible for new developers
to
contribute relatively quickly.

No new committers have been added over the last three months but we have
had
very welcome patches from new contributors. Activity on the developer
mailing
list seems to have reduced which is disappointing. This may be remedied in
part by encouraging more discussion that currently takes place in the issue
tracker to take place in the mailing list.

The target of creating an initial release is ongoing. With the conversion
of
most of the interface to a new basic design, it is only completion of a
subset
of the dashboard design that should be seen as a requirement for an initial
release. This remains the immediate primary goal of the community.


Thanks to everyone for their patience in waiting so long for me to
complete that!

Cheers,
    Gary



On 06/12/2012 11:05 AM, Gary Martin wrote:

Hi,

Assuming that nobody else has done it, I am finally able to attempt to do
the report. I'll write something up, paste it into the wiki and then repeat
that here. I assume that we will be able to continue revising the entry so
I will hope for comments on anything I have missed or might be considered
misleading.

Cheers,
    Gary


On 06/09/2012 12:06 PM, Greg Stein wrote:

I'll write a report later tonight (I'm EST). But if someone gets there
first... cool.

Cheers,
-g
On Jun 9, 2012 6:18 AM, "Marvin"<[email protected]>    wrote:


Dear podling,

This email was sent by an automated system on behalf of the Apache
Incubator PMC.
It is an initial reminder to give you plenty of time to prepare your
quarterly
board report.

The board meeting is scheduled for Wed, 20 June 2012, 10:00:00 PST. The
report
for your podling will form a part of the Incubator PMC report. The
Incubator PMC
requires your report to be submitted 2 weeks before the board meeting,
to
allow
sufficient time for review and submission (Wed, Jun 6th).

Please submit your report with sufficient time to allow the incubator
PMC,
and
subsequently board members to review and digest. Again, the very latest
you
should submit your report is 2 weeks prior to the board meeting.

Thanks,

The Apache Incubator PMC

Submitting your Report
----------------------

Your report should contain the following:

  * Your project name
  * A brief description of your project, which assumes no knowledge of
the
project
   or necessarily of its field
  * A list of the three most important issues to address in the move
towards
   graduation.
  * Any issues that the Incubator PMC or ASF Board might wish/need to be
aware of
  * How has the community developed since the last report
  * How has the project developed since the last report.

This should be appended to the Incubator Wiki page at:

  
http://wiki.apache.org/**incubator/June2012<http://wiki.apache.org/incubator/June2012>

Note: This manually populated. You may need to wait a little before this
page is
      created from a template.

Mentors
-------
Mentors should review reports for their project(s) and sign them off on
the
Incubator wiki page. Signing off reports shows that you are following
the
project - projects that are not signed may raise alarms for the
Incubator
PMC.

Incubator PMC






Reply via email to