[
https://issues.apache.org/jira/browse/BLUR-278?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Vikrant Navalgund updated BLUR-278:
-----------------------------------
Remaining Estimate: 3h
Original Estimate: 3h
Adding the time estimate.
> Fix the Blur shell and Blur console to use the right API to fetch the list of
> online Controller nodes.
> ------------------------------------------------------------------------------------------------------
>
> Key: BLUR-278
> URL: https://issues.apache.org/jira/browse/BLUR-278
> Project: Apache Blur
> Issue Type: Sub-task
> Components: Blur
> Affects Versions: 0.3.0
> Reporter: Vikrant Navalgund
> Fix For: 0.3.0
>
> Original Estimate: 3h
> Remaining Estimate: 3h
>
> We need to modify the Blur Shell and the Blur console, which are fetching the
> online Controller servers using the old API to use the new method.
--
This message was sent by Atlassian JIRA
(v6.1#6144)