There are other scenarios I think you missed ...

One other one happened on MW ... the project wide devaluation of about  
20% because of a perceived over-payment was matched by a roughly 19%  
performance improvement at almost the same time of the ATI  
application ... the consequences of that are still showing there ...

One other point I did not make in *MY* list of questions and that is  
also not addressed is the questions of the NCI projects ... at the  
moment we have at least three issuing work, QCN, FreeHAL and Anansi  
with the latter two both having network usage components ... a feature  
of the "original" credit system that is also not addressed by the  
proposals ...

On Nov 6, 2009, at 12:16 PM, Nicolás Alvarez wrote:

> Has anyone checked how this new design helps with the two (three?)
> credit scenarios I posted on the thread "[boinc_projects] Catastrophe
> is looming; desperately need advice" on Jul 14 2009?
>
> I think I should put them somewhere more permanent...
>
> -- 
> Nicolas
> _______________________________________________
> boinc_projects mailing list
> [email protected]
> http://lists.ssl.berkeley.edu/mailman/listinfo/boinc_projects
> To unsubscribe, visit the above URL and
> (near bottom of page) enter your email address.

_______________________________________________
boinc_dev mailing list
[email protected]
http://lists.ssl.berkeley.edu/mailman/listinfo/boinc_dev
To unsubscribe, visit the above URL and
(near bottom of page) enter your email address.

Reply via email to