Currently the server calculates its own DCF. And when asked for 43200 seconds of work would inflate the fpops number to account for the difference. This would mean that the work that is received would have a sort of correct value for time before being inflated again by the DCF calculation.
No, this is a startup issue, but it can happen any time: 1) A new project is joined 2) A new application is pushed down 3) A new dataset that has a greatly different run time than expected is pushed down. A possible way out: If a project has "do not use DCF" set, modify the meaning of this somewhat. Instead of ignoring the DCF entirely, add a DCF modifier to each task of a project which is 1/DCF at time of acceptance of the task (this counteracts the fact that the DCF is calculated twice, once at the server and once at the client). Each time the DCF is used to calculate the remaining time to run, multiply by this value. When the DCF for the project is recalculated, recalculate as normal ignoring this modifier. This will eventually have the DCF stabilize near 1, and allow the server to calculate what the fpops ought and have the client responsive to massive miscalculations in initial state. From: Richard Haselgrove [mailto:[email protected]] Sent: Wednesday, April 03, 2013 10:22 AM To: McLeod, John; [email protected] Subject: Re: [boinc_dev] The reason for a local DCF. Fully agreed. But remember that you have to follow the logic and also re-instate the DCF code on that project's server. Say you set work fetch limits of 0.5 days minimum and 0.5 days additional - or a target work buffer: 43200.00 + 43200.00 sec Once TrainWreck@home (eventually) becomes the highest priority project and your client issues a work request, it will request 43200 seconds of work. The *server*, which currently ignores DCF in its calculations, will still use the 1hr 17mn estimation - 4620 seconds. The server will assign 10 jobs to fill the request. Once those 10 jobs arrive at the client, they will be re-estimated by the client using DCF, which by then will be about 19.27 And your client will announce that it has received 10 days 7 hours of new work. And no doubt panic. [I am assuming that TrainWreck@home's previous batch of work for this application was correctly estimated, and that John has volunteered for TrainWreck@home for long enough to have an established and stable APR for HitTheBuffers v1.01] ________________________________ From: "McLeod, John" <[email protected]<mailto:[email protected]>> To: "[email protected]<mailto:[email protected]>" <[email protected]<mailto:[email protected]>> Sent: Wednesday, 3 April 2013, 13:40 Subject: [boinc_dev] The reason for a local DCF. I am currently watching a train wreck that would not be happening if DCF was turned on for a particular project. The initial estimate is a wall time of one hour seventeen minutes. The actual wall time is twenty four hour 44 minutes. The problem is that work fetch and the scheduler do not know that the problem exists for tasks #2 through #20 and are downloading work from other projects, not realizing that the saturated time is 20 days and not 20 hours. _______________________________________________ boinc_dev mailing list [email protected] http://lists.ssl.berkeley.edu/mailman/listinfo/boinc_dev To unsubscribe, visit the above URL and (near bottom of page) enter your email address.