Thanks for both of you for these details. By "serialized", I mean non-parallel package builds because of the waitrepos.
Can host.capacity be changed on the fly (pop into psql while stuff is
running)? If not, how well does the system handle a kojid stop with a bunch
of outstanding work?
/etc/init.d/kojid stop
change capacity
/etc/init.d/kojid start
and outstanding tasks are handled cleanly.
--
buildsys mailing list
[email protected]
https://admin.fedoraproject.org/mailman/listinfo/buildsys
