Hi, I have updated yesterday to latest series 6.0 and noticed that BOM can be selected after production confirm, But the original problem is still there, I go to a production order, confirmed, and change the BOM,
There in the Scheduled products I can see the change, But in the products to consume still the old products. Also, being possible to edit the bom, while the MO is confirmed, this only changes record changes of the manufacturing factor, but not new products or removed ones. I'll attach a video for mere details. Thanks -- You received this bug notification because you are a member of C2C OERPScenario, which is subscribed to the OpenERP Project Group. https://bugs.launchpad.net/bugs/773128 Title: openerp manufacturing order changing the bom does not change products to consume Status in OpenERP Modules (addons): Fix Committed Bug description: Manufacturing order changing the bom does not change products to consume I have two BoM's for one product let say A, I go to an existing production order for that product. I change the BoM for that order. In the tab scheduled product the change is reflected and we can see the new product(Raw2) needed to produce the finished product Problem: In the Products to consume list, the old product (Raw1) from the old BoM is still there, also the internal stock moves are not canceled for that product (Raw1) It is the behavior by design, or is a problem? Thank you for your hard work. To manage notifications about this bug go to: https://bugs.launchpad.net/openobject-addons/+bug/773128/+subscriptions _______________________________________________ Mailing list: https://launchpad.net/~c2c-oerpscenario Post to : [email protected] Unsubscribe : https://launchpad.net/~c2c-oerpscenario More help : https://help.launchpad.net/ListHelp

